Free in-home measure and quote - PGT, CGI and CWS impact lines compared on your actual openings, style by style
PGT Shingle, Tile & Metal Roofing in Plantation: What to Know First
We install and service PGT shingle, tile, and metal roofing systems across Plantation as an independent PGT service provider. Most PGT roof work in Plantation takes one to three days once materials are on site, depending on whether we’re re-flashing around PGT skylights, replacing underlayment beneath PGT tile profiles, or re-securing PGT metal roof panels that have worked loose in storm winds. Our pricing is straight-forward: we quote line by line before work starts, and the number on the quote is the number on the bill. If you own a PGT roof in Plantation and you’re seeing leaks, loose tile, or metal panels that rattle in the afternoon thunderstorms, call (772) 577-2915. Dale Kessler and the TruePane crews have been working on Broward County roofs long enough to know which PGT details hold up and which ones don’t.
How PGT Products Fail - and How We Fix Them
PGT builds a solid roof product, but Plantation’s climate finds the weak spots. Here’s what we see most often under the PGT nameplate.
- PGT tile roof underlayment breakdown at the eave line. PGT’s concrete and clay tile profiles are heavy, and in Plantation’s summer heat the underlayment beneath them bakes against the roof deck. We regularly find the eave-line underlayment has dried and cracked while the field of the roof still looks fine. Our fix is to lift the PGT tile at the eave, replace the failed underlayment with a high-heat rated self-adhered membrane, and re-set the tile on new fasteners.
- PGT metal roof panel oil-canning and fastener back-out on east-facing slopes. The morning sun hits Plantation’s east roof slopes hard, and we see metal panels expand and contract enough that factory fasteners begin to back out after ten to fifteen years. The tell is a faint rattle on windy afternoons and visible fastener heads standing proud of the panel. We replace the failed fasteners with heavy-gauge stainless screws with oversized sealing washers, then re-torque the surrounding panel runs to spec.
- PGT shingle roof granule loss concentrated at ridge and hip lines. PGT’s architectural shingle lines are rated for the Florida sun, but ridge cap shingles take double the UV exposure of field shingles. In Plantation’s wet-dry cycles, ridge shingles on PGT roofs we inspect often show granule loss years before the field shingles do. We replace ridge and hip cap before water gets under the shingle, which costs a fraction of what waiting costs.
- Leaks where PGT skylights or roof windows meet the roof deck. This is the most common service call we run on PGT roofs in Plantation. The skylight curb flashing works loose over time, or the sealant at the transition from PGT roof system to skylight curb dries out. We re-flash the curb, replace the sealant with a marine-grade product, and test the junction with a hose before we call it done.
- Tile slippage on PGT roofs with older batten systems. The original batten-and-fastener systems PGT tile roofs were installed with in the 1990s and early 2000s sometimes let individual tiles slip after heavy rain saturates the deck. We see it most often on lower roof sections where water pools for a few hours after a storm. We re-set slipped tiles, verify the batten is sound, and replace any degraded fasteners in that run so the next storm doesn’t shift them again.
Our PGT Shingle, Tile & Metal Roofing Process
Every PGT roof job in Plantation follows the same steps. No shortcuts, no surprises.
- 1
We walk the roof and document what we see. Photos of every damaged area, a written condition report, and a list of what needs fixing now versus what’s worth watching. We do this whether you’re calling about a leak, a rattle, or just want an honest second opinion.
- 2
We identify your exact PGT roofing system. We match the tile profile, shingle line, or metal panel pattern so materials match. PGT has changed some tile profiles over the years, and a mismatched tile on a visible slope is a repair that looks like a repair.
- 3
We decide OEM versus quality aftermarket, and we tell you which and why. For PGT warranty-sensitive work, we use OEM components. For older systems where PGT has discontinued the line, we source aftermarket materials that match in profile, color, and weight. You’ll know before we install anything.
- 4
We do the work with the right fasteners, the right sealants, and the right anchors. Every fastener and sealant on a PGT roof in Plantation has to stand up to UV, salt air, and hurricane-season wind loads. We don’t use whatever’s on the truck; we use what the system calls for.
- 5
We test before we pack up. Hose test at every repair junction. Visual inspection of surrounding areas. Fasteners checked for torque. If it leaks, it’s not done.
- 6
We walk the finished job with you. Photos of what we fixed, what we used, and a line-item invoice that matches the original quote. Your Done Right Promise starts the day we finish.
What PGT Shingle, Tile & Metal Roofing Costs in Plantation
Here’s what Plantation homeowners can expect to pay for common PGT roofing work with TruePane. These are honest ranges for typical single-family homes; the exact number depends on roof access, slope, and the extent of the damage.
| PGT Roofing Job | Typical Plantation Price Range |
|---|---|
| Ridge cap replacement (shingle roofs) | $450 - $900 |
| Skylight curb re-flashing (per skylight) | $350 - $700 |
| Tile re-set and fastener replacement (small area) | $300 - $650 |
| Metal roof panel re-fastening (per panel run) | $200 - $500 |
| Full PGT roof inspection with condition report | $150 - $250 |
The biggest cost driver on PGT tile roofs is disposal, so we break it out separately and line-item the underlayment and fasteners. On PGT metal roofs, the panel run length and roof pitch are what move the number. Older PGT tile profiles can be harder to source, which adds material time if we’re matching a discontinued line. Call (772) 577-2915 for a free estimate. We’ll put the numbers in writing before you decide anything.
Why Plantation Homeowners Call TruePane Windows & Doors for PGT Work
We’ve served Plantation and Broward County since 2008, and we plan to be here in thirty more. Dale Kessler learned fenestration at McFatter Technical College in Davie and spent two decades setting windows and doors across this county before founding TruePane in 2008. PGT roofs show up on a lot of Plantation homes, and our crews know the system, not just the brand name. When a PGT roofing component isn’t the right fix, we’ll tell you straight, because we also work with CGI, CWS, ES Windows, and ECO Window Systems and we’ll point you toward the right product for the opening if a replacement makes more sense than a repair. Our Done Right Promise means if it’s not done right, we make it right, no paperwork, no arguing. If the pane is not true, the job is not done, and the same rule applies to every PGT roof we touch.
FAQs
Warranty coverage depends on the specific PGT product, the age of the system, and whether previous work was done to manufacturer spec. As an independent PGT service provider, we don’t administer PGT’s warranty, but we document every repair so you have a clear record if a warranty claim comes up later. We use OEM components on warranty-sensitive work for exactly this reason. Call (772) 577-2915 and we’ll look at your specific system before any work is scheduled.
In most cases, yes. PGT tile profiles have shifted over the years, and some lines are discontinued, but we’ve built enough local relationships with roofing suppliers across Broward County to source close matches in color, profile, and weight. For discontinued PGT lines, we’ll show you the closest match on paper before we install a single tile.
For an active leak, call (772) 577-2915. A live person answers 24 hours a day, 7 days a week, and we’ll get a technician out to tarp and assess before the water does more damage. Most non-emergency PGT roofing repairs in Plantation can be scheduled within a few days once materials are confirmed.
If we’re out for the third time on the same section of PGT roofing, we’ll tell you honestly that the cost of repeated repairs is catching up to the cost of replacing that section. We don’t sell replacements on roofs that have years of life left in them. When replacement is the right call, we’ll quote it line by line on paper so you can compare repair versus replace with real numbers.
When the scope of the PGT roofing work requires a permit under Plantation building codes, yes, we pull the permit and the work passes inspection. Most repair work doesn’t trigger permitting, but re-roofs and structural changes do. We’ll tell you before we start what’s needed for your specific job.
Get a Straight Answer on Your PGT Roof in Plantation
If you own a PGT shingle, tile, or metal roof in Plantation and something isn’t right, call (772) 577-2915. We’ll walk your roof, tell you what’s actually wrong, and quote the fix in writing. Free estimates, no pressure, and a live person on the line every time. Dale Kessler’s rule hasn’t changed: if it is not square, level, and in writing, it is not done.
Written by Dale Kessler, Owner, TruePane Windows & Doors at TruePane Windows & Doors, serving Plantation and nearby areas.
Six Reasons Homeowners Choose TruePane Windows & Doors
Impact systems engineered to design pressures up to +/-100, matched to your wind zone - your openings hold when the storm arrives.
Low-E insulated impact glass from our manufacturer lines commonly cuts monthly cooling bills 20-30%.
Laminated impact glass shuts out up to 40% of outside noise - traffic, neighbors, weather.
Monitoring services run $30-90 a month. Laminated impact glass resists forced entry around the clock, with no subscription.
Florida homeowners average around 25% savings on the windstorm portion of their policy after protecting every opening - some homes qualify for more.
A full impact package upgrades curb appeal, buyer confidence and appraised value in one project.



Before
After
Before
After
Before
After